MAJOR PROJECTS
BUSHENYI DISTRICT LOCAL GOVERNMENT
MAJOR DISTRICT PROJECTS TO BE UNDERTAKEN DURING 2021/22 FY
S/N |
LOCATION/ SUBCOUNTY |
NAME OF PROJECT |
BUDGET UG. SHS |
SOURCE OF FUNDING |
1 |
DISTRICT HEADQUARTERS |
Renovation of Bushenyi District Administration Block-Phase 2 |
100,000,000 |
Transitional Development Grant |
Fencing of District Stadium-Phase 2 |
26,000,000 |
DDEG |
||
2 |
BITOOMA |
Grading of Kashasha-Kayengo-Mushakira-Kemitaha P/S-Kimuri Tea Collection Centre Road-10km |
18,000,000 |
Uganda Road Fund |
Routine Manual Maintenance of 59 km of District Feeder Roads using Road gangs for 2 – months (March and April 2022). -Warugo-Kyamamari – Bitooma Bridge – 12 km - Bitooma – Nyakabonde – 5 km. - Warugo river(Yusufu’s Farm) – Bitooma – 3.5 km - Nyanga – Bubaare – Kabumburi Dip Tank – Rwanziro – Katiba Village – Warugo Bridge – 14.5 km. - Kicwangisa – Kyamamari - Ekihangire T/C - Warugo Bridge – 9 km - Bitooma T/C – Nyanura – Bitooma S/C Headquarters – 3 km - Yehunde P/S – Kashasha – Kayengo – Mushakira – Kemitaha – Kimuri Tea Collection Centre – 10 km. - Warugo river – Kyamamari – 2 km Total 59 km |
14,160,000 |
URF (Uganda Road Fund) |
||
Construction of Kaijengye Bridge |
300,000,000 |
Retooling Project MoLG |
||
Rehabilitation of Kyamuhunga S.S.S-Bitooma Trading Centre Road-11km |
515,000,000 |
MoW&T(Interconnectivity Project) |
||
Construction of Maternity/General Ward,2-Staff Houses,4-Stances Lined VIP Latrine,2-Stances Lined Latrine,Placenta Pit,Medical Waste Pit,Incenerator and External Works at Kashambya HC III |
1,770,850,616 |
GoU(MoH)-World Bank-IDA-Uganda Reproductive Maternal and Child Health Improvement Project. |
||
Construction of 5-Stances Lined VIP Latrines at Kakira P/S |
25,000,000 |
SFG (School Facilities Grant) |
||
Grading of 3.8km of Community Access Road-Kayengo-Kimuri |
6,933,000 |
Uganda Road Fund (URF) |
||
Rehabilitation of Protected Spring at Mirambi-Kimuri Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Protected Spring at Nyanura-Bitooma Central |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Deep Borehole at Bubaare P/S |
924,800 |
Rural Water Conditional Grant(RWCG) |
||
3 |
BUMBAIRE |
Grading of Nyaruzinga-Bumbaire-Kitabi Road-9km |
16,200,000 |
Uganda Road Fund(URF) |
Spot murraming of Nyaruzinga-Bumbaire-Kitabi Road-Road sections totalling 1km |
12,200,000 |
Uganda Road Fund (URF) |
||
Grading of Kabushaho-Katonya-Numba Road-7km |
12,600,000 |
Uganda Road Fund(URF) |
||
Installation of 1-line of 1200mm diameter ARMO steel metallic culverts at Keitambogo Swamp crossing |
2,000,000 |
Uganda Road Fund (URF) |
||
Construction of a Semi-Detached staff house at Kabushaho HC III |
100,000,000 |
PHC-Development |
||
Rehabilitation of Protected Spring at Kiyaga P/S-Kiyaga Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Protected Spring at Kakindo-Kamutyaza |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Routine Manual Maintenance of 42.3 km of District Feeder Roads using Road gangs for 2 – months - (March and April 2022). - Ihaama Bridge – Kantunda – Bumbaire- Kitakuka – Kibingo – Kigurutsi – Kagogo Bridge – 14 km. - Bumbaire – Bweranyangi – Kacuncu – Rwemiyonga – 4.3 km - Bumbaire – Rwemiyonga – 5 km - Kabushaho – Buyanja – 9 km - Nyaruzinga – Bumbaire – Kabushaho – Kitabi – 10 km Total 42.3 km |
10,152,000 |
Uganda Road Fund(URF) |
||
Installation of 1-line of 600mm diameter reinforced concrete culverts on Rwencenkye-Kihunda road |
2,500,000 |
Uganda Road Fund (URF) |
||
Grading of 2.6km of Community Access Roads
- Rwencenkye-Kihunda |
4,886,000 |
Uganda Road Fund (URF) |
||
4
|
IBAARE
|
Grading of Omukatagu-Mutukura-Nyarurambi-Kagari-Ndurumo Road
- 8km |
14,400,000 |
Uganda Road Fund (URF) |
Rehabilitation of Protected Spring at Migina-Ryeishe Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Protected Spring at Rutsiro-Keinamo Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Shallow Well at Nyakashojwa-Ryeishe Parish |
924,800 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Protected Spring at Kamutambira-Ryeishe Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Routine Manual maintenance of 36.5 km of District Feeder Roads using Road gangs for 2 months - (March and April 2022). -Kitabi Demo - Ryeishe HC III – Bwooma – Ibaare T/C – Nyamahwa Bridge – Kiyaga – Ahabutunda – Keinamo HC II – Karubuga Village –Omukatagu – Mutukura – Nyarurambi – Kagari – Ahakikoona – Keinamo HC II – Nyamirama – Jeniffer’s residence – Kagari – Ndurumo –Kagogo Bridge-Ndurumo- 19.5 km. - Ibaare Trading Centre – Njeru – Bihasha Bridge – Rugyeya Bridge – Nyakatuntu Circuit – Nyaruka – Nyakashojwa – Bwooma – Kiruhura – Mutanoga – Kashenyi – Ntaruka – Bwooma – Kitabi Parish – Kayoora river – Rurengye – 17 km Total 36.5 km |
8,760,000 |
URF (Uganda Road Fund) |
||
Spot murraming of 0.4km of Community Access Roads
- Kitabi-Bwooma |
5,808,000 |
Uganda Road Fund (URF) |
||
5 |
KAKANJU |
Completion of a 2- Classroom block with office and store at Kemitaha P/S |
40,000,000 |
SFG (School Facilities Grant) |
Completion of a 2- Classroom block with office and store at Munanura P/S |
40,000,000 |
SFG (School Facilities Grant) |
||
Construction of a Semi-Detached staff house at Kakanju HC III |
100,000,000 |
PHC-Development |
||
Rehabilitation of Deep Borehole at Kijumo II-Kabaare Parish |
924,800 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Akashanda G.F.S-Pipeline -Katunga Parish |
3,856,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Protected Spring at Nyabitekyere-Kakanju Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Protected Spring at Kyentobo Central-Kakanju Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Spot murraming of Kakanju-Kashanda-Kashasha Road-Road sections totaling 2km. |
28,000,000 |
Uganda Road Fund (URF) |
||
Routine Manual Maintenance of 34.7 km of District Feeder Roads using Road gangs for 2 – months (March and April 2022). - Ryamabengwa – Kakanju – Nyaruhorera – 4.6 km - Kakanju – Kashanda – Nombe – 6 km. - Ngorora – Kaijengye – Kitojo – Kashanda – 8 km. - Nombe – Bwegyeme – Katimba – 4.5 km. - Kijumo – Warugo – 4 km - Kijumo – Nyakabingo – Kashahsa – 7.6 km. Total 34.7 km |
8,328,000 |
URF (Uganda Road Fund) |
||
Grading of 6.3km of Community Access Roads
- Kwatampora-Kabagarame T/C-Kategabirwa-2km
- Kiyagara C.O.U-Mingane-1.4km
- Kashushano-Mworozi valley-1.6km
- Baguma-Kyebitsire-Biremire’s Valley-1.3km |
11,353,000 |
Uganda Road Fund (URF) |
||
6
|
KYABUGIMBI
|
Construction of 5-Stances Lined VIP Latrines at Kitwe P/S |
25,000,000 |
SFG (School Facilities Grant) |
Grading of Rubingo-Kihumuro-Katikamwe-Kyabugimbi Road 8km |
14,400,000 |
Uganda Road Fund (URF) |
||
Routine Manual Maintenance of 35.5 km of District Feeder roads using Road gangs for 2 – months (March and April 2022). - Nyamirima – Kyabugimbi – Nyamyerande – Omukayembe – Buhimba – Kyarwamukara – 18 km. - Kyamutiganzi – Katikamwe – 2 km - Rubingo – Kyabugimbi – Katikamwe – Kihumuro – 8 km. - Kyabugimbi – Kitwe – Rutooma -3 km - Mukora – Kajunju – Karyango – 4.5 km Total 35.5 km |
8,520,000 |
URF (Uganda Road Fund) |
||
Grading of 5.4km of Community Access Roads
- Akashushano-Kyamiko-Karyango-3km
- Ndyabahinduka’s place-Rweikiriro P/S -1.5km
- Kajunju Central-Kyamugasha-Runyinya Coffee Factory-0.9km |
9,799,000 |
Uganda Road Fund (URF) |
||
7 |
KYAMUHUNGA |
Completion of a 2- Classroom Block with Office and Store at Swazi P/S |
24,000,000 |
SFG (School Facilities Grant) |
Construction of 5-Stances Lined VIP Latrines at Kanyamurera P/S |
25,000,000 |
SFG (School Facilities Grant) |
||
Construction of a SEED School at Kanyamurera |
2,300,000,000 |
UgIFT |
||
Completion of a Twin Staff House at Kibazi HC III. |
50,000,000 |
PHC Development Grant. |
||
Rehabilitation of Kalinzu Eco-Tourism Road-0.5km |
400,000,000 |
Transitional Development Grant. |
||
Rehabilitation of Rwenjojo-Kyamabare-Kitatera Road-3km |
200,000,000 |
Transitional Development Grant. |
||
Completion of Kyamuhunga SubCounty Administration Block |
200,000,000 |
Transitional Development Grant. |
||
Rehabilitation of Kayanga G.F.S |
20,000,000 |
Rural Water Conditional Gtant(RWCG) |
||
Installation of 4-lines of 600mm diameter ARMO steel metallic along Butare Trading Centre-Bugongo-Kalinzu Road |
4,000,000 |
Uganda Road Fund (URF) |
||
Installation of 1-line of 1200mm diameter ARMO steel metallic culverts along Butare Trading Centre-Bugongo-Kalinzu Road |
2,000,000 |
Uganda Road Fund (URF) |
||
Installation of 2-lines of 1200mm diameter ARMO steel metallic culverts along Kyaruhaga-Tekateka-Kyabajojo Road |
4,000,000 |
Uganda Road Fund (URF) |
||
Repair of Headwalls/Wingwalls at Omukasusano Trading Centre along Kabingo-Warugo Road |
1,500,000 |
Uganda Road Fund (URF) |
||
Grading of Katiba Village-Bitooma Bridge-3km |
5,400,000 |
Uganda Road Fund (URF) |
||
Routine Manual Maintenance of 31.5 km of district Feeder Roads using Road gangs for 2 – months (March and April 2022). - Kakoni – Manengo – Warugo River (Yusufu’s Farm) – 4 km -Rwenjojo – Kyamabare – Kitatera – 6.5 km. - Kabingo – Warugo river; Kitatera – Bitooma Bridge – 8 km. - Rwenjojo – Warugo river – 1.5 km - Bitooma Bridge – Warugo Bridge – 3 km - Warugo – Kabingo – 4 km - Kalinzu – Nyarugote – 4 km Total 31.5 km |
7,560,000
|
URF (Uganda Road Fund) |
||
Grading of 5.7km of Community Access Roads
- Nshumi-Ahamahembe Gente-Nshekyerezi |
10,426,000 |
Uganda Road Fund (URF) |
||
8
|
KYEIZOOBA
|
Construction of 5-Stances Lined VIP Latrines at Kyamacumu P/S |
25,000,000 |
SFG (School Facilities Grant) |
Completion of a 2-Classroom Block with Office and Store at Kyeizooba P/S |
35,000,000 |
SFG (School Facilities Grant) |
||
Partial Completion of a 2-Classroom Block with Office and Store at Kakamba P/S |
31,000,000 |
SFG (School Facilities Grant) |
||
Rehabilitation of Protected Spring at Ryakisire-Karaaro Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Protected Spring at Nyamiyaga-Nyamiyaga Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Protected Spring at Rwemitozo-Karaaro Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Shallow Well at Nkoni II-Karaaro Parish |
924,800 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Protected Spring at Katerero II-Buyanja Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Installation of 2-lines of 600mm diameter ARMO steel metallic culverts at Rwamuganga Swamp crossing along Kihunda-Nyariyanga-Rwamuganga Road |
2,000,000 |
Uganda Road Fund (URF) |
||
Installation of 600mm diameter ARMCO steel metallic culverts at Kanyinemuyaga and Buyanja junctions along Kyeizooba Playground-Kabuba Road |
8,000,000 |
Uganda Road Fund (URF) |
||
Grading of Kihunda-Nyariyanga-Rwamuganga Road- 6km |
10,800,000 |
Uganda Road Fund (URF) |
||
Grading of Ntungamo-Bwera Kyamugambira-Rwemitozo Road- 7km |
12,600,000 |
Uganda Road Fund (URF) |
||
Spot murraming of Ntungamo-Bwera- Kyamugambira Road-Road sections totaling 1 km |
12,200,000 |
Uganda Road Fund (URF) |
||
Routine Manual Maintenance of 33 km of district Feeder Roads using Road gangs for 2 – Months (March and April 2022). - Buyanja – Kabuba – 2 km - Kyeizooba Playground – Kabuba – 8 km - Runyinya – Kyeizooba – 5.3 km - Ntungamo – Kyamugambira – Rwemitozo – Nyariyanga – 8.5 km - Rwemiyonga – Bwera – 1.4 km - Kihunda – Nyariyanga – Rwamuganga – 7.8 km Total 33 km |
7,920,000 |
URF (Uganda Road Fund) |
||
Grading of 7.6 km of Communty Access Roads - Ryakisire LC I-Kyamacumu P/S-Late Baryenyima’s home-1.3km - Akagonero-Nyakinengo-Nyampikye Bridge-1.2km
- Kabakobokye-Kinyancwera-1km
- Buyanja Mosque-Buyanja P/S-2km
- Kyeizooba SubCounty HeadQuarters Road-0.6km
- Nkoni-Kanyamuhita-1.5km |
13,787,000 |
Uganda Road Fund (URF)
|
||
9 |
NYABUBARE |
Completion of a 3-Classroom Block at Kizinda P/S |
40,000,000 |
SFG(School Facilities Grant) |
Partial Construction of a 2-Classroom Block with office and store at Nyarutuntu P/S (up to Ring Beam Level) |
25,000,000 |
SFG(School Facilities Grant) |
||
Partial Completion of a Staff House at Kihungye P/S |
29,000,000 |
SFG(School Facilities Grant) |
||
Rehabilitation of Protected Spring at Nyabitote-Nyabubare Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Rehabilitation of Deep Borehole at Nyabubare Sec.School-Nyabubare Parish |
924,800 |
Rural Water Conditional Grant(RWCG) |
||
Grading of Katokye-Kanyantaama Road-4km |
7,200,000 |
Uganda Road Fund (URF) |
||
Spot murraming of Katokye-Kanyantaama Road- road sections totaling 1km |
12,200,000 |
Uganda Road Fund (URF) |
||
Spot murraming of Kibingo
- Kashozi Road-0.5km |
7,000,000 |
Uganda Road Fund (URF) |
||
Spot murraming of Kizinda Nyabubare-Ncwera I Bridge Road- road sections totaling 0.5km(at Bigazi Hill |
7,000,000 |
Uganda Road Fund (URF) |
||
Routine Manual Maintenance of 43.2 km of District Feeder Roads using Road gangs for 2 – months (March and April 2022). -Nyabubare – Kashozi – Nyarugote – 11 km. - Kizinda – Nyabubare – Nyamizi River – Ncwera I Bridge – 10.5 km. - Nyarugote – Kakombe – Nyakatsiro – 6 km. - Kizinda – Nkanga – Igambiro – 12 km - Nyamirembe – Omukatensani – 3.7 km Total 43.2 km |
10,368,000 |
URF (Uganda Road Fund) |
||
Grading of 9.9km of Community Access Roads
- Kibitsya-Kacwampare-Nyabitote-Ruharo-2.9km
- Omukatojo-Nyabitote-0.8km
- Rwekitooma-Nyarugote-Nyakahandagazi-Orubingo-3.7km
- Tumanyane-Omukatojo-2.5km |
17,899,000 |
Uganda Road Fund (URF) |
||
10
|
RUHUMURO
|
Completion of a 2-Classroom Block with office and store at Kayanga P/S |
40,000,000 |
SFG (School facilities Grant) |
Construction of a Semi-Detached staff house at Ruhumuro HC III |
100,000,000 |
PHC-Development |
||
Construction of Kyabukumu G.F.S-Phase 3 |
270,000,000 |
Rural Water Conditional Gtant(RWCG) |
||
Rehabilitation of Protected Spring at Nyakatete-Ruhumuro Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |
||
Grading of Ekikorijo-Ihanda-Bwenkingo Road-6km |
10,800,000 |
Uganda Road Fund (URF) |
||
Construction of Embankment at Kafunjo-Nyeibingo |
40,000,000 |
Uganda Road Fund (URF) |
||
Construction of Embankment at Nyeibingo “B” along Kayanga-Kansingyesa Road |
20,000,000 |
Uganda Road Fund (URF) |
||
Routine Manual Maintenance of 80 km of District Feeder Roads using Road gangs for 2 – months (March and April 2022). - Nyamyerande – Ruhumuro – Burungira – Kikorijo – Nyeibingo – Kafunjo – Omukayembe – 15 km. - Burungira – Nyakabonde – 3.5 km - Kafunjo – Karyango – 4.5 km - Kyarukari – Kacwamba – Kafunjo – 7 km. - Rutooma – Kacwamba – 4 km. - Obwoma – Omukati – Kyeijongo – Burungira – Ihanda – Nyamyerande – 16 km. - Nyambare – Karyango – Kayanga – Kansingyesa – Ekikorijo – Ihanda – 16 km. - Bwenkingo – Nyakishojwa – Ngando – Kacwamba – Akagoro – Bugaara Central – Ruhumuro Sub County Junction – Rwekitooma – Rwa – Rwomuyanga – 14 km. Total 80 km |
19,200,000 |
URF (Uganda Road Fund) |
||
Grading of 3.9km of Community Access Roads.
- Rwandaro-Kansingyesa-1.4km.
- Ihanda-Nyeibingo- 1.7km.
- Nyakatete A Road-0.8km |
7,166,000 |
Uganda Road Fund (URF) |
||
11 |
RWENTUUHA TOWN COUNCIL |
Completion of a Staff House at Ncucumo P/S |
60,000,000 |
SFG(School Facilities Grant) |
12 |
NKANGA |
Rehabilitation of Protected Spring at Nyakashojwa-Nkanga Parish |
1,062,000 |
Rural Water Conditional Grant(RWCG) |